System Migration Case Study
Client: Montana State University
Background: Montana State University needed to transition their AiM environment to Assetworks’ SaaS platform to ensure continuity of operations and reduce dependency on on-premises infrastructure.
Problem: MSU faced the challenge of migrating their existing system while preserving custom developments that had been built over the years to streamline their operations. The migration needed to minimize disruptions to their business processes.
Solution: As a consultant, I advised MSU on strategies to integrate their custom developments into the new SaaS environment. I provided detailed recommendations on combining these solutions with Assetworks’ hosted platform, ensuring compatibility and efficiency. I also managed the migration process, coordinating with stakeholders to facilitate a smooth transition.
Results: The migration enabled MSU to leverage Assetworks’ hosted environment with minimal interruption to their business needs. The custom solutions were successfully integrated, saving time, reducing costs, and eliminating potential bottlenecks in their operations.
Technologies Used: Assetworks AiM, MySQL Server, Java.
Back to Portfolio